Our Scope of Work for Building as a Battery Implementation

What you need to know in advance

At the Design Stage

1

Keep your architectural design. Mechanical systems will get smaller. Your Building will perform better.

2

Collaboration with design team to simplify building design, reduce cost and drive high performance.

3

Design assist and room by room air flow schedules, in slab air distribution and equipment sizing.

4

Building as a Battery™ specifications copyrighted controls for proposed projects and building permits.

5

Coordination related to Building Permit, Tendering and contract document preparation.

Our Scope of Work

At the Construction Stage

1

Preparation of drawings for Hollow core slab field adaptations.

2

Supply of inserts to modify Hollow Core Slabs during production.

3

Supervision of Hollowcore slab adaptations in the plant and field. Inspection of HVAC installation to suit BaaB™ method.

4

Pressure testing of active Hollow core slabs after field modifications.

5

Mechanical shop drawing and Pre-functional review of installation requirements with subtrades.

6

Controls shop drawing pre-programming and start up review to suit thermal storage method.

7

Evaluation of air balancing contractors and commissioning reports for compliance with our specification requirements.

Let’s build something together for less